top of page

TEMPORARY Soldier Beam & Tie-Back
Reliable stability during construction phases
Temporary soldier beam and tie-back systems provide robust excavation support during construction. These systems can be designed for removal or abandonment in place once permanent construction is complete.
WHERE IT WORKS BEST
KEY BENEFITS
-
Building construction excavations
-
Underground parking construction
-
Utility vault construction
-
Bridge abutment excavations
-
Rapid installation
-
Excellent deformation control
-
Reusable components possible
-
Proven reliability
EXAMPLES

LA Metro Westside Purple Line Extension
LOS ANGELES, CA
PB&A served as Engineer of Record (EOR) for the temporary Support of Excavation for four underground stations comprising the Purple Line Extension. This high-speed rail alternative connects commuters traveling between downtown Los Angeles, the Miracle Mile, Beverly Hills, and Westwood. The design was complicated by the requirement to keep Wilshire Blvd. open as a live thoroughfare over the excavations. PB&A designed concrete decking panels to maintain vehicular and pedestrian traffic while excavation took place beneath.
bottom of page

